Project Background

The Hangzhou Jintou New-Generation Information Technology Equipment Manufacturing Base is a key advanced manufacturing project in Hangzhou, Zhejiang Province, and an important carrier for the region's new-generation information technology equipment manufacturing industry. The development brings together production workshops and R&D buildings on one site, so the HVAC system has to serve two very different duty profiles at once: high-load, continuous manufacturing space and quiet, tightly controlled engineering and research areas.

To meet those requirements, the project adopted Holtop DX air handling units together with heat recovery fresh air ventilation units, with a total supply of 107 units (sets) covering the production and R&D buildings.


Project Requirements

  • Precise temperature and humidity control: both the manufacturing and R&D areas house precision equipment, so indoor conditions had to be held inside narrow bands rather than simply kept "comfortable".
  • Independent zone control: workshops, R&D rooms and support areas run on different loads and operating hours, so each zone needed to be controlled separately.
  • Clean and stable environment: filtered air supply and stable air distribution were required to protect equipment and processes from dust and fluctuation.
  • Low noise: acoustic performance had to suit engineering and research work carried out alongside operating equipment.
  • Energy efficiency: with long operating hours across a large site, system energy consumption was a primary evaluation criterion.
  • Schedule certainty: equipment supply had to match the construction programme of a municipal key project.


Scope of Supply

Equipment Type Function in the Project Application Area
DX air handling units Direct-expansion cooling and heating with precise temperature and humidity control, staged filtration and zone-independent operation Production workshops, R&D buildings
Heat recovery fresh air ventilation units Continuous filtered outdoor air supply with heat recovery, keeping indoor air fresh while reusing exhaust energy All occupied zones


Total delivered: 107 units (sets) of DX air handling units and heat recovery fresh air ventilation units, supplied as a single coordinated package.


Results

All 107 units (sets) of DX air handling and heat recovery fresh air equipment were delivered to the production and R&D buildings. Key outcomes include:

  • Independent, precise temperature and humidity control in every production and R&D zone.
  • A clean, stable and low-noise environment for precision equipment production and research work.
  • Lower system energy consumption achieved through heat recovery on the fresh air side.
  • A cleaner, healthier and more stable working environment for the site's engineering and production teams.


Why This Project Matters

New-generation information technology equipment manufacturing is one of the most demanding HVAC applications on the market. The processes are sensitive to temperature, humidity and particulate levels, the buildings run almost continuously, and energy costs are scrutinised closely. It demands HVAC equipment that can hold precision conditions year after year rather than merely meet a comfort specification.