logo
Home >

Latest company case about Beijing Holtop Artificial Environment Technology Co., Ltd Certifications

Holtop Rooftop Units Withstand Harsh Coastal Environment at Algeria Oran Desalination Plant

2024-06-05

Latest company case about Holtop Rooftop Units Withstand Harsh Coastal Environment at Algeria Oran Desalination Plant

Location: Oran, Algeria (Coastal/High-Salinity Environment)

Solution Provider: Beijing Holtop Air Conditioning Co., Ltd. (Holtop)

Contract Date: June 2024

Scope: Supply, Delivery, and Technical Support of 12 Customized Rooftop Units (RTUs)

 

   Holtop is proud to have been selected as the HVAC partner for a major seawater desalination plant in Oran, Algeria. This critical infrastructure project requires robust and reliable climate control solutions to protect sensitive electrical and control equipment from a highly corrosive coastal environment. In June 2024, Holtop supplied 12 customized rooftop units (RTUs)designed specifically to meet the extreme challenges of this application, ensuring uninterrupted operation and longevity of the plant's internal systems.

 

Desalination plants present perhaps the most severe operating conditions for HVAC equipment:

 

• Extreme Corrosion: Salt-laden air rapidly accelerates corrosion, causing standard HVAC units to fail prematurely and jeopardizing critical equipment cooling.

 

• Reliability is Non-Negotiable: Plant operations are 24/7. Any HVAC failure can lead to shutdowns of sensitive control systems, resulting in massive financial losses and disruption of water supply.

 

• Harsh Climate: High ambient temperatures and intense sunlight place additional stress on cooling systems, demanding superior performance and heat rejection capabilities.

 

• Remote Location: Ease of maintenance and local technical support capabilities are crucial to minimize downtime.

 

The Holtop Solution: Engineered for Resilience

 

   Understanding these critical needs, Holtop did not supply standard off-the-shelf products. Instead, we delivered a bespoke solution with the following specialized features:

 

  1. Advanced Anti-Corrosion Protection:
  • Marine-Grade Coating: Full-unit epoxy resin coating applied to all external and internal metal surfaces (casing,框架, drain pan, coils).
  • Stainless Steel Components: Critical components such as screws, hinges, and drain pans were upgraded to 304 or 316 stainless steel to resist salt spray corrosion.
  • Corrosion-Resistant Condenser Coils: Coils featured enhanced fin spacing and a special hydrophilic blue anti-corrosion coating to improve durability and maintain efficiency.

2. Robust Design for Maximum Uptime:

  • Heavy-Duty Construction: Reinforced cabinets and structural frames to withstand high winds common in coastal areas.
  • High-Efficiency Components: Branded compressors and ECM motors were selected for reliability, energy savings, and precise control in variable conditions.
  • Integrated Control System: Smart controls with fault alarms and remote monitoring capabilities, allowing plant engineers to anticipate issues before they cause downtime.

 

Project Scope & Delivery

 

• Product: 12 Units of Holtop Customized Rooftop Units (RTUs)

 

   The successful partnership with the Oran Desalination Plant underscores Holtop's capability to serve the world's most demanding industrial sectors. We move beyond standard commercial applications to deliver heavy-duty, customized climate solutions that ensure the reliability of critical infrastructure like water desalination plants.