2024-08-21
Client: Hilton Hotel Group
Location: Chongqing, China
Project Type: 5-Star Luxury Hotel (New Construction / Major Renovation)
Solution Provider: Beijing Holtop Air Conditioning Co., Ltd.
Contract Date: August 2024
Scope: Supply of Customized & Energy-Efficient Air Handling Solutions
A flagship hotel like Hilton requires an HVAC system that is not only powerful and reliable but also exceptionally quiet and energy-conscious. The key challenges included:
The Holtop Solution: Tailored HVAC Systems for Hospitality
Quantity: 16 Sets
Purpose: These units are the heart of the hotel's energy strategy. They continuously pre-condition incoming fresh air using the energy from exhaust air, recovering both sensible (heat) and latent (moisture) energy. This drastically reduces the load on heating and cooling systems, leading to significant energy savings year-round in Chongqing's hot summers and chilly, humid winters.
Quantity: 8 Sets
Purpose: These large-capacity, custom-configured units were designed to serve high-demand areas like the grand ballroom, main lobby, and banquet facilities. Built with durability and ease of maintenance in mind, they feature easy-access components and are constructed from anti-corrosion materials for a long service life.